HMH Engineering worked with ITD District 1 Residency and C.L. Heilman to finish the Mullan Bridges project. HMH worked seamlessly under the District 1 Staff Engineer to perform construction engineering and inspections services including earthwork, paving, curb and gutter, and project close-out. Project consisted of full reconstruction though the town of Mullan and included two bridge replacements, one box culvert replacement, sidewalks, curb and gutter, urban approaches, utility adjustments, gabion baskets, and pedestrian safety railing.